FAST FACTS: Facility Upgrades

by Joe Trause, Director of Facilities

We are pleased to announce the successful completion of the implementation of a new cost efficient energy program and referendum projects for the 2016-2017 school year. As highlighted in the presentation to the Board of Education, a new program of significance to the District is the Energy Savings Improvement Program (ESIP). ESIP included the installation of LED lighting throughout the district, high-efficiency boilers and enhanced boiler controls, upgraded building manage­ment systems, among additional equipment condition monitors. These upgrades improve operations and energy efficiency with no additional cost to the Verona taxpayer through the State approved New Jersey Clean Energy Program. The replacement of antiquated lighting with newer, more energy efficient technology will help us reduce our carbon footprint while reducing energy consumption.

The progress of the referendum is the result of the collective efforts of many people over the past several years. The majority of the projects were conducted over the past two summers and continued through Fall 2016. The recent projects include the Verona High School music room addition, Thomas J. Sellitto multipurpose athletic field, VHS tennis courts, mechanical system replacement, masonry repairs, and kitchen renovations at HEW and VHS. The multipurpose athletic lower field is currently under construction and in the final stages with an anticipated completion date of December 2016 just in time for Spring 2017.

Outside of the referendum, additional facilities projects throughout the district include stair tread replacement that improve aesthetics and safety, restroom renovations, concrete walkway replacement, gymnasium floor refurbishment, and paver walkway installation. A special thank you to our custodial and maintenance staff for all of their hard work and efforts to help make our schools a safe and inviting place for children to learn.

The following lists highlights the major improvements to each of our schools completed over the past several months:

VHS

  • Baseball Bleacher Repairs
  • Carpet Replacement
  • Ceiling Replacement Hallways and 11 Classrooms
  • Gymnasium Floor Refurbishing
  • HVAC system
  • Kitchen Renovation
  • Learning Commons Enhancement
  • LED Lighting Upgrade
  • Masonry Repairs
  • Multipurpose Athletic Field
  • Music Room Addition
  • Parking Lot Expansion
  • Restroom Renovation
  • Tennis Courts
  • Water Fountain Installation
  • Upgrade STEM Room

HBW

  • Kitchen Renovation
  • LED Lighting Upgrade
  • Masonry Repairs
  • Rain Barrel Installation
  • Science Room Renovation
  • Stair Tread Replacement

LNG

  • Boiler Replacement
  • Door Hardware Installation
  • Installation of Playground Mulch
  • LED Lighting Upgrade
  • Water Fountain Installation

FNB

  • Concrete Walkway Installation
  • Installation of Air Conditioners
  • LED Lighting Upgrade
  • Masonry Repairs
  • SCA Paver Installation

FOR

  • Installation of Playground Mulch
  • LED Lighting Upgrade
  • Masonry Repairs
  • SCA Library Renovation
  • Stair Tread Replacement

BRK

  • Installation of Playground Mulch
  • LED Lighting Upgrade
  • Masonry Painting
  • Masonry Repairs

 

Click here to read more articles in the Verona Public Schools Magazine 2016-2017 Edition.